Xactimate Price List

What is Xactimate?

Xactimate® is a powerful estimation tool used to create, send, and receive construction estimates. It is primarily used for estimating restoration and repairs, insurance claims, and new construction. 

Xactimate has been widely used by insurance companies in the past decade. Insurance company adjusters use it to calculate building damage, repair, and rebuilding costs. Adjusters use Xactimate to generate loss estimates and claim settlement offers.

Suffered from Water or Mold Damage?

Schedule an assessment now!

This software collects data from countless material suppliers and millions of actual estimates and is intended to reflect actual market pricing. Your insurance company is likely to turn an Xactimate estimate into the settlement offer they make to you.

In order to make your claim process as smooth and easy as possible, we at Water’s Fault use the Xactimate generated estimates to provide them to insurance companies. That format is easily readable and understandable to all adjusters. That makes the process of filing and processing a claim more transparent, both to us, the contactor, and to an insurance company.

The below price list is effective June 12th, 2024, and is based on Zip Code 94010.

It is taken from the Xactimate software and reflects the original figures that are put into our final restoration or construction estimate. 

NOTE: Xactimate may change their rates without notification and we won’t be able to adjust them on the website immidiatly. Certain conditions of the project may also reflect on the price. Therefore these prices should be consideed as approximate and final invoice going to be made based on actual Xactimate numbers.

ServicePrice
INITIAL INSPECTION
Emergency service call - Monday-Friday 8:00 a.m. - 5:00 p.m.EA271.33
Emergency service call - after business hoursEA407.00
ACCESS TO WORK
Content Manipulation charge - per hourHR77.23
AIR SCRUBBER
Negative air fan/Air scrubber (24 hr period) - No monit.DA80.57
Add for HEPA filter (for negative air exhaust fan)EA231.93
Carbon vapor filter (for air scrubber) - 16" x 16"EA84.01
EQUIPMENT SETUP
Equipment setup (hourly charge)HR96.83
EQUIPMENT MONITORING
Equipment monitoring (hourly charge)* minimum 3hr per visitHR96.83
EQUIPMENT
Air mover (per 24 hour period) - No monitoringEA38.00
Dehumidifier (per 24 hr period) - 70-109 ppd - No monitoringEA83.54
Wood floor drying extraction mat (per 24 hr prd) No monitoringDA181.75
Fill holes created by wall cavity dryingEA2.38
Wall cavity drying-Dctd type (per 24 hr period) No monitoringDA76.50
Wall cavity drying-Inj. type (per 24 hr period) No monitoringDA141.00
Drill holes for wall cavity dryingEA0.96
CONTAINMENT
Containment Barrier - tension post - per dayDA3.35
Peel & seal zipperEA17.41
Containment Barrier/Airlock/Decon. ChamberSF1.47
PROTECTION
Floor protection - self-adhesive plastic filmSF0.72
Floor protection - heavy paper and tapeSF0.50
Protect - Cover with plasticSF0.47
REMOVAL
Water extraction from hard surface floorSF0.33
Water extraction from carpeted floorSF0.69
WALLS
Tear out trimLF0.91
Tear out baseboardLF0.91
Tear out wet drywall, cleanup, bag for disposalSF1.64
Tear out wet drywall, cleanup, bag, per LF - up to 4' tallLF8.73
Tear out wet drywall, cleanup, bag, per LF - up to 2' tallLF6.18
Add for wet drywall on high walls - 11' to 14' highSF0.31
Add for wet drywall on high walls - 14' to 20' highSF0.42
Tear out wet plaster, cleanup, bag for disposalSF3.79
Tear out and bag wet insulationSF1.24
FLOORS
Tear out tackless strip and bag for disposalLF1.70
Tear out wet non-salvageable carpet, cut & bag for disposalSF1.02
Lift carpet for dryingSF0.70
Tear out wet carpet pad and bag for disposalSF0.95
Tear out non-salvageable tile floor & bag for disposalSF6.34
Add on to tear out mortar bed for tileSF3.12
Tear out non-salv solid/engeneered wood floor & bag for disposalSF6.37
Tear out non-salv floating floor & bag for disposalSF3.22
Tear out non-salv underlayment & bag for disposalSF2.77
BATHROOM
Tear out cabinetry - vanityLF16.05
Toilet - DetachEA86.53
Gas/water line cap/plug - per capEA24.19
Remove Plumbing fixture supply lineEA8.46
Dishwasher - DetachEA96.78
Remove Garbage disposerEA42.33
Sink - single basin - DetachEA51.67
Cabinet - lower (base) unit w/shoring - DetachEA54.23
KITCHEN
Range - freestanding - electric - DetachEA37.34
Refrigerator - DetachEA49.77
Cabinet - upper (wall) unit - DetachLF29.94
Tear out cabinetry - lower (base) unitsLF16.05
Cabinet - full height unit - DetachLF34.87
CLEANING
HEPA Vacuuming - Light - (PER SF)SF0.59
Apply anti-microbial agent to the surface areaSF0.45
Clean floorSF0.80
Mask and cover register / air returnEA6.11
Sink - undermount - DetachEA85.36
Add on to tear out tile concrete shower curb - per LFLF13.35
Add on to tear out tile framed shower curb - per LFLF20.03
Temporary water heater - (Bid Item)EA2260.00
EQUIPMENT TAKE DOWN
Equipment takedown (hourly charge per tech)HR96.83
EQUIPMENT CLEANING AND DECONTAMINATIONEA70.57
DEBRIS REMOVAL
Haul debris - per pickup truck load - including dump feesEA266.85
Single axle dump truck - per load - including dump feesEA554.32
Dumpster load - Approx. 20 yards, 4 tons of debrisEA904.52
GENERAL ITEMS
Eye protection - plastic goggles - DisposableEA10.93
Personal protective gloves - Heavy duty (per pair)EA7.50
Plastic bag - used for disposal of contaminated itemsEA3.52
LABOR MINIMUMS APPLIED
General labor - labor minimumEA38.74